Skip to content

35 ยท Regulatory gap assessment โ€” RBI NBFC Directions 2026 and SEBI CSCRF

Status: ๐ŸŸก Partly built. The assessment is complete; some of the gaps it lists are still open. What the lights mean

./securax comply                      both, summary + top of the backlog
./securax comply rbi | cscrf          one regulation   (--md for the full table, --json for machines)
./securax comply cscrf --category qre only what applies to that SEBI category (mii | qre | mid | small | self)
./securax comply --verify             consistency only (also in ./securax verify, ./securax fitness and the evidence pack)
Full requirement-by-requirement tables: regulatory/rbi-nbfc-gap-assessment.md and regulatory/sebi-cscrf-gap-assessment.md (generated; a test fails if they drift from the maps). Both also ship in ./securax evidence.

First: "100% compliant" is not a property software can have

Compliance belongs to the regulated entity. Roughly a third of both texts is Board and committee constitution, the CISO's reporting line, people, premises, contracts, a DR site, auditors and filings. Those rows are marked ๐Ÿ› entity and are never counted as covered by software. What this estate can honestly claim is narrower: for the requirements software can address, which are demonstrably met, which partly, and which not at all.

What was assessed, and what was not

RBI SEBI
Text RBI (NBFCs โ€“ Cybersecurity, Technology: Risk, Resilience and Assurance Framework) Directions, 2026, RBI/DoS/2026-27/461, 31 Jul 2026, from the copy you supplied CSCRF circular SEBI/HO/ITD-1/ITD_CSC_EXT/P/CIR/2024/113 (20 Aug 2024; 205 pages), fetched from sebi.gov.in, read with the clarifications of 31 Dec 2024, 30 Apr 2025, 28 Aug 2025 and the June 2025 FAQs
Scope NBFCs only; chapter by layer and size (III < โ‚น500 cr, IV โ‰ฅ โ‚น500 cr, V Middle/Upper/Top) SEBI-regulated entities; five categories (MII, Qualified RE, Mid-size, Small-size, Self-certification)
Rows 58 paragraph groups 75 standard groups

Not assessed: SEBI's separate cloud framework, the Annexure-K CCI scoring itself, circulars after 28 Aug 2025 (a vendor blog mentions a 2026 advisory; I could not confirm one), and anything the supplied RBI text does not contain. If your institution is a bank, this RBI document is not the one that applies to it (it is the NBFC direction): tell me the entity type, layer/size and SEBI category and I will narrow the output and re-check the right text.

Result (software-scope coverage; entity items excluded)

Supported Partial Gap Entity N/A Coverage
RBI NBFC 1 30 3 21 3 47.1 %
SEBI CSCRF (all categories) 1 50 4 16 4 47.3 %

Scoring: supported 1, partial 0.5, gap 0. "Supported" needs a journey or test as proof, so it is rare by design. These percentages describe a lab estate against the regulator's text; they are not an audit opinion and not a statement about your institution.

The gaps that matter (found by reading the code against the text)

Update: items 1โ€“3 were built afterwards (identity-aware gateway, incident clock, data-residency guard โ€” doc 36); they moved from gap to partial (the entity's identity provider, alerting, filing and attestations remain theirs). The original findings are kept below as written.

  1. The gateway does not authenticate callers. The "principal" is a hash of whatever Authorization string (or client IP) arrives. There are no users, roles, lock-out, MFA, privileged-user logging or auditor role at the AI access point (RBI 113-116, 21(3); CSCRF PR.AA.S1-S3, S7, S9 and PIM). This is the biggest single gap and it also blocks non-repudiation in the audit trail.
  2. No incident-reporting clock. RBI para 28/141: DAKSH within 6 hours of detection plus CERT-In; CSCRF RS.CO: SEBI and CERT-In within 6 hours, SEBI portal details within 24 hours, quarterly report within 15 days. Nothing tracks, templates or reminds.
  3. Data localisation. CSCRF requires Regulatory Data to stay within India; the router can send prompts to Gemini/Groq/OpenRouter. PII redaction reduces exposure but nothing enforces "classified data never leaves India". Cloud stages are not constrained to India regions or MeitY-empanelled offerings (Annexure-J).
  4. Backups and RPO. CSCRF RPO is 15 minutes and RTO 2 hours; RBI wants near-zero RPO. Restore speed is fine (12.5 s etcd restore on the twin) but backups are periodic, unencrypted tar.gz with no immutable/off-site copy.
  5. Audit trail integrity. Gateway audit lines are verified end to end but are not tamper-evident, carry no authenticated identity, and retention is whatever the shipper keeps (RBI 21(8), 109-110).
  6. Patch SLA clock and end-of-life tracking (CSCRF PR.MA.S3: High 1 week, Moderate 2 weeks, Low 1 month; RBI 92-93).
  7. CCI (CSCRF Annexure-K, MII/Qualified RE, half-yearly) is not computed; threat hunting (quarterly), DAST, signing of evidence packs, IPv6 readiness are absent.

Honest limits

  • Status is our own judgement of one estate against the text as read on 2026-10-14; read the notes, challenge them, and check every row you rely on against the primary text.
  • A row marked supported means a mechanism exists and a test proves it, within the scope stated in its note (usually the AI channel only).
  • SEBI's grouping of standard IDs follows its own guideline blocks; the rows are therefore groups, not one row per ID.
  • Nothing here has been shown to an auditor or regulator. It is a working plan, not evidence of compliance.

Proposed build order (each closes high-priority rows; each gets a journey)

  1. Identity-aware gateway (OIDC/JWT, roles, lock-out, subject in audit) โ†’ RBI 113-116, CSCRF PR.AA.
  2. ./securax incident (6-hour clock, DAKSH/CERT-In/SEBI field sets, quarterly roll-up, evidence sealing) โ†’ RBI 28/141, CSCRF RS.CO.
  3. Classification-aware routing + India-region guard for cloud stages โ†’ CSCRF data localisation and Annexure-J.
  4. Encrypted, checksummed, off-site/immutable backups + Postgres WAL archiving + scheduled drills โ†’ RC.RP.S2/S4, RBI 128-135.
  5. Hash-chained audit log and signed evidence packs โ†’ RBI 21(8), 21(9), 31.